Making tool knowledge usable, from digital resumes to predictive control.
IQX IT's application concept: Data, functionality and connectivity are jointly defined for your process.
AIDATool management · Application concept
overview
Digitizing and making transparent tool knowledge
AIDA · Tool Management
Merge Excel spreadsheets, files, and paper documents. Record experiential knowledge and repair notes.
CAD, drawings & materials
ERP & Tool Master Data
AIDA
Data · Knowledge · Tested Decisions
Using existing systems
Drawings, history and knowledge combine
Making digital tool resumes shareable
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
Digitizing and making transparent tool knowledge
Using existing systems
Record experience and repair notes
Structure information according to tool and application
Drawings, history and knowledge combine
Making digital tool resumes shareable
The process in detail
Combine Excel, files and paper documents
Combine information with the appropriate process and source reference.
Record experience and repair notes
To make connections and open questions visible for professional evaluation.
Structure information according to tool and application
Provide results, assumptions and required evidence in a comprehensible manner.
Drawings, history and knowledge combine
Coordinate next steps with those responsible and obtaining the necessary approvals.
Making digital tool resumes shareable
Combine information with the appropriate process and source reference.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01Combine Excel, files and paper documents
02Record experience and repair notes
03Structure information according to tool and application
04Drawings, history and knowledge combine
05Making digital tool resumes shareable
Schematic sequence according to the respective concept documents.
The areas of responsibility in connection
Digitizing and making transparent tool knowledgeInformation in connection
Tool & ComponentAssign information
Machine & MaterialMaking dependencies visible
Parameters & RecipeDocument assumptions
Deployment, number of shots & operating timeClarify any open issues
Maintenance, repair & conditionCheck results
Quality, Costs & Production PlanTrack approvals
Schematic example view. Content and responsibilities will be defined in the specific process.
Connecting tool, process and application
ToolID, Version, Status, History
processMachine, parameters, material
ResultQuality, service life, cost
Next stepTechnical review and approval
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
Topic 1
Design, optimize, and scale knowledge
AIDA · Tool Management
Combining requirements and engineering expertise. Coordinating design and simulation.
CAD, drawings & materials
ERP & Tool Master Data
AIDA
Data · Knowledge · Tested Decisions
Using existing systems
Trace back application experiences and field data
Developing data-based lifecycle services
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
Design, optimize, and scale knowledge
Using existing systems
Coordinate design and simulation
Include manufacturing and quality documentation
Trace back application experiences and field data
Developing data-based lifecycle services
The process in detail
Combining requirements and engineering knowledge
Combine information with the appropriate process and source reference.
Coordinate design and simulation
To make connections and open questions visible for professional evaluation.
Include manufacturing and quality documentation
Provide results, assumptions and required evidence in a comprehensible manner.
Trace back application experiences and field data
Coordinate next steps with those responsible and obtaining the necessary approvals.
Developing data-based lifecycle services
Combine information with the appropriate process and source reference.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01Combining requirements and engineering knowledge
02Coordinate design and simulation
03Include manufacturing and quality documentation
04Trace back application experiences and field data
05Developing data-based lifecycle services
Schematic sequence according to the respective concept documents.
The areas of responsibility in connection
Design, optimize, and scale knowledgeInformation in connection
Tool & ComponentAssign information
Machine & MaterialMaking dependencies visible
Parameters & RecipeDocument assumptions
Deployment, number of shots & operating timeClarify any open issues
Maintenance, repair & conditionCheck results
Quality, Costs & Production PlanTrack approvals
Schematic example view. Content and responsibilities will be defined in the specific process.
Connecting tool, process and application
ToolID, Version, Status, History
processMachine, parameters, material
ResultQuality, service life, cost
Next stepTechnical review and approval
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
Topic 2
AI-supported tool design
AIDA · Tool Management
Analyze CAD, materials, and tolerances. Consider quantities and variants.
01Analyze CAD, materials, and tolerances
02Consider quantities and variants
03Include machine and manufacturing conditions
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
AI-supported tool design
Using existing systems
Consider quantities and variants
Include machine and manufacturing conditions
Research existing projects and experiences
Prepare technically suitable design proposals and alternatives
The process in detail
Analyze CAD, materials, and tolerances
Combine information with the appropriate process and source reference.
Consider quantities and variants
To make connections and open questions visible for professional evaluation.
Include machine and manufacturing conditions
Provide results, assumptions and required evidence in a comprehensible manner.
Research existing projects and experiences
Coordinate next steps with those responsible and obtaining the necessary approvals.
Prepare technically suitable design proposals and alternatives
Combine information with the appropriate process and source reference.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01Analyze CAD, materials, and tolerances
02Consider quantities and variants
03Include machine and manufacturing conditions
04Research existing projects and experiences
05Prepare technically suitable design proposals and alternatives
Schematic sequence according to the respective concept documents.
Technical relationships and dependencies
AI-supported tool designInformation in connection
Tool & ComponentAssign information
Machine & MaterialMaking dependencies visible
Parameters & RecipeDocument assumptions
Deployment, number of shots & operating timeClarify any open issues
Maintenance, repair & conditionCheck results
Quality, Costs & Production PlanTrack approvals
Schematic example view. Content and responsibilities will be defined in the specific process.
Connecting tool, process and application
ToolID, Version, Status, History
processMachine, parameters, material
ResultQuality, service life, cost
Next stepTechnical review and approval
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
Topic 3
Technology, parameter and application knowledge
AIDA · Tool Management
Unlocking technological rules and standards. Linking application data and customer cases.
01Technological rules and standards unlock
02Linking application data and customer cases
03Consider material, machine and process parameters
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
Technology, parameter and application knowledge
Using existing systems
Linking application data and customer cases
Consider material, machine and process parameters
Compare quality, service life and damage patterns
Making proven solutions and application limits discoverable
The process in detail
Technological rules and standards unlock
Combine information with the appropriate process and source reference.
Linking application data and customer cases
To make connections and open questions visible for professional evaluation.
Consider material, machine and process parameters
Provide results, assumptions and required evidence in a comprehensible manner.
Compare quality, service life and damage patterns
Coordinate next steps with those responsible and obtaining the necessary approvals.
Making proven solutions and application limits discoverable
Combine information with the appropriate process and source reference.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01Technological rules and standards unlock
02Linking application data and customer cases
03Consider material, machine and process parameters
04Compare quality, service life and damage patterns
05Making proven solutions and application limits discoverable
Schematic sequence according to the respective concept documents.
From question to substantiated answer
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
AIDA
Connecting questions and shared knowledge
Using existing systems
Sources & References
Documented answer
Open questions
Schematic example view. Content and responsibilities will be defined in the specific process.
Connecting tool, process and application
ToolID, Version, Status, History
processMachine, parameters, material
ResultQuality, service life, cost
Next stepTechnical review and approval
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
Topic 4
Uptime, productivity and TCO
AIDA · Tool Management
Compare tool concepts and process parameters. Consider cycle time, availability, and quality.
01Comparing tool concepts and process parameters
02Consider cycle time, availability and quality
03Include downtime, tool changes, and downtime costs
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
Uptime, productivity and TCO
Using existing systems
Consider cycle time, availability and quality
Include downtime, tool changes, and downtime costs
Evaluate costs per part and total effort transparently
Prepare the technical and economic basis for decision-making
The process in detail
Comparing tool concepts and process parameters
Combine information with the appropriate process and source reference.
Consider cycle time, availability and quality
To make connections and open questions visible for professional evaluation.
Include downtime, tool changes, and downtime costs
Provide results, assumptions and required evidence in a comprehensible manner.
Evaluate costs per part and total effort transparently
Coordinate next steps with those responsible and obtaining the necessary approvals.
Prepare the technical and economic basis for decision-making
Combine information with the appropriate process and source reference.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01Comparing tool concepts and process parameters
02Consider cycle time, availability and quality
03Include downtime, tool changes, and downtime costs
04Evaluate costs per part and total effort transparently
05Prepare the technical and economic basis for decision-making
Schematic sequence according to the respective concept documents.
Economic principles and decision-making
Fundamentals & Assumptions
Comparing tool concepts and process parameters
Consider cycle time, availability and quality
Include downtime, tool changes, and downtime costs
Assessment & next steps
Evaluate costs per part and total effort transparently
Prepare the technical and economic basis for decision-making
Schematic example view. Content and responsibilities will be defined in the specific process.
Tool concepts in economic comparison
Illustrative comparison from the original TCO view
feature
A · Standard
B · Premium coating
C · High-performance geometry
Tool price
120 €
220 €
350 €
Stand time
20,000 pieces
60,000 pieces
100,000 pieces
cycle time
48 s
42 s
38 s
Rejection rate
2,0 %
0,8 %
0,5 %
Tool change
15 min
10 min
8 min
Repair costs / tools
40 €
60 €
80 €
Cost per part
0,028 €
0,018 €
0,014 €
Cost per Part · Example Values
Variant A0,028 €
Variant B0,018 €
Variant C0,014 €
Standby time in parts
Variant A20.000
Variant B60.000
Variant C100.000
Conceptual values from the template, not a newly calculated estimate or confirmed customer results.
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
Topic 5
Closed-Loop Tool Engineering
AIDA · Tool Management
Capture part design and requirements. Document design and validation.
01Capturing part design and requirements
02Document the interpretation and validation
03Toolmaking and application combine
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
Closed-Loop Tool Engineering
Using existing systems
Document the interpretation and validation
Toolmaking and application combine
attribute service life, quality and field experience
Improve the next generation of tools with these insights
The process in detail
Capturing part design and requirements
Combine information with the appropriate process and source reference.
Document the interpretation and validation
To make connections and open questions visible for professional evaluation.
Toolmaking and application combine
Provide results, assumptions and required evidence in a comprehensible manner.
attribute service life, quality and field experience
Coordinate next steps with those responsible and obtaining the necessary approvals.
Improve the next generation of tools with these insights
Combine information with the appropriate process and source reference.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01Capturing part design and requirements
02Document the interpretation and validation
03Toolmaking and application combine
04attribute service life, quality and field experience
05Improve the next generation of tools with these insights
Schematic sequence according to the respective concept documents.
Learning from implementation and results
01Capturing part design and requirements
02Document the interpretation and validation
03Toolmaking and application combine
04attribute service life, quality and field experience
05Improve the next generation of tools with these insights
Incorporate findings into the next assessment
Schematic example view. Content and responsibilities will be defined in the specific process.
Connecting tool, process and application
ToolID, Version, Status, History
processMachine, parameters, material
ResultQuality, service life, cost
Next stepTechnical review and approval
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
Topic 6
Digital Tool Lifecycle Service
AIDA · Tool Management
Supporting the design and commissioning process. Combining manufacturer knowledge with operational data.
01Design and commissioning are accompanied
02Combining manufacturer knowledge with operational data
03Assign deployment, quality, and service cases
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
Digital Tool Lifecycle Service
Using existing systems
Combining manufacturer knowledge with operational data
Assign deployment, quality, and service cases
Prepare proactive service suggestions
attribute experiences in development and customer service
The process in detail
Design and commissioning are accompanied
Combine information with the appropriate process and source reference.
Combining manufacturer knowledge with operational data
To make connections and open questions visible for professional evaluation.
Assign deployment, quality, and service cases
Provide results, assumptions and required evidence in a comprehensible manner.
Prepare proactive service suggestions
Coordinate next steps with those responsible and obtaining the necessary approvals.
attribute experiences in development and customer service
Combine information with the appropriate process and source reference.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01Design and commissioning are accompanied
02Combining manufacturer knowledge with operational data
03Assign deployment, quality, and service cases
04Prepare proactive service suggestions
05attribute experiences in development and customer service
Schematic sequence according to the respective concept documents.
Steps and handovers over time
Step 1:Design and commissioning supportpreparation / testing
Step 2:Combining manufacturer knowledge with operational data- Preparation / Testing
Step 3:Assign deployment, quality, and service cases.Preparation / Review
Step 4:Prepare proactive service suggestions/ Preparation / Review
Step 5:Bringing back experience in development and customer service.Result / Handover
Schematic example view. Content and responsibilities will be defined in the specific process.
Connecting tool, process and application
ToolID, Version, Status, History
processMachine, parameters, material
ResultQuality, service life, cost
Next stepTechnical review and approval
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
Topic 7
Digital tool book and tool file
AIDA · Tool Management
Merge master data and drawings. Assign process parameters and usage history.
01Merge master data and drawings
02Assign process parameters and usage history
03Document repairs and maintenance
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
Digital tool book and tool file
Using existing systems
Assign process parameters and usage history
Document repairs and maintenance
Making experiential knowledge permanently available
Provide a complete tool history for the specialist departments
The process in detail
Merge master data and drawings
Combine information with the appropriate process and source reference.
Assign process parameters and usage history
To make connections and open questions visible for professional evaluation.
Document repairs and maintenance
Provide results, assumptions and required evidence in a comprehensible manner.
Making experiential knowledge permanently available
Coordinate next steps with those responsible and obtaining the necessary approvals.
Provide a complete tool history for the specialist departments
Combine information with the appropriate process and source reference.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01Merge master data and drawings
02Assign process parameters and usage history
03Document repairs and maintenance
04Making experiential knowledge permanently available
05Provide a complete tool history for the specialist departments
Schematic sequence according to the respective concept documents.
Documents, review and approval
Digital tool book and tool fileInformation in connection
Tool & ComponentAssign information
Machine & MaterialMaking dependencies visible
Parameters & RecipeDocument assumptions
Deployment, number of shots & operating timeClarify any open issues
Maintenance, repair & conditionCheck results
Quality, Costs & Production PlanTrack approvals
Schematic example view. Content and responsibilities will be defined in the specific process.
Digital tool file · WZ-4711
72.450
Current number of shots
80.000
Next maintenance limit
Left bumper supportTool assigned
ENGEL 500 tMachine context
Rest until maintenance7,550 shots
Illustrative values from the original tool manual; maintenance limits are determined professionally.
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
Topic 8
Process data and last successful setting
AIDA · Tool Management
Assign tool, machine, and material. Link target and actual parameters to the production run.
01Assign tool, machine and material
02Linking target and actual parameters to a production run
03Consider quantity, cycle time and quality
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
Process data and last successful setting
Using existing systems
Linking target and actual parameters to a production run
Consider quantity, cycle time and quality
Provide last successful setting with sources
Restart and technical review support
The process in detail
Assign tool, machine and material
Combine information with the appropriate process and source reference.
Linking target and actual parameters to a production run
To make connections and open questions visible for professional evaluation.
Consider quantity, cycle time and quality
Provide results, assumptions and required evidence in a comprehensible manner.
Provide last successful setting with sources
Coordinate next steps with those responsible and obtaining the necessary approvals.
Restart and technical review support
Combine information with the appropriate process and source reference.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01Assign tool, machine and material
02Linking target and actual parameters to a production run
03Consider quantity, cycle time and quality
04Provide last successful setting with sources
05Restart and technical review support
Schematic sequence according to the respective concept documents.
Compare fundamentals and impacts
Fundamentals & Assumptions
Assign tool, machine and material
Linking target and actual parameters to a production run
Consider quantity, cycle time and quality
Assessment & next steps
Provide last successful setting with sources
Restart and technical review support
Schematic example view. Content and responsibilities will be defined in the specific process.
Connecting tool, process and application
ToolID, Version, Status, History
processMachine, parameters, material
ResultQuality, service life, cost
Next stepTechnical review and approval
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
Topic 9
Faults, repairs and maintenance
AIDA · Tool Management
Record the malfunction with photos and tool context. Document the analysis and diagnosis.
01Document the fault with photos and tool context
02Document analysis and diagnosis
03Trace repairs, parts, and procedures
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
Faults, repairs and maintenance
Using existing systems
Trace repairs, parts, and procedures
Record review and approval
Keep an eye on the maintenance schedule and shot counts
Evaluate recurring errors and experiences
The process in detail
Document the fault with photos and tool context
Combine information with the appropriate process and source reference.
Document analysis and diagnosis
To make connections and open questions visible for professional evaluation.
Trace repairs, parts, and procedures
Provide results, assumptions and required evidence in a comprehensible manner.
Record review and approval
Coordinate next steps with those responsible and obtaining the necessary approvals.
Keep an eye on the maintenance schedule and shot counts
Combine information with the appropriate process and source reference.
Evaluate recurring errors and experiences
To make connections and open questions visible for professional evaluation.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01Document the fault with photos and tool context
02Document analysis and diagnosis
03Trace repairs, parts, and procedures
04Record review and approval
05Keep an eye on the maintenance schedule and shot counts
06Evaluate recurring errors and experiences
Schematic sequence according to the respective concept documents.
Steps and handovers over time
Step 1:Document the fault with photos and tool context.Preparation / Inspection
Step 2:Document analysis and diagnosis /Preparation / Examination
Step 3:Repair, trace parts and measures.Preparation / Inspection
Step 4:Document review and approval.Preparation / Review
Step 5:Keep an eye on the maintenance plan and shot count.Preparation / Inspection
Step 6:Evaluate recurring errors and experiences.Result / Handover
Schematic example view. Content and responsibilities will be defined in the specific process.
From error to documented release
Fault:Crack at cavity 3 documented with photo
Analyzethe cause and check the ejector plate for replacement.
Repair:Ejector plate replaced and repair documented.
Document thetest run and technical approval.
Recreated example process from the tool history.
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
Topic 10
Shot count, stand times and wear
AIDA · Tool Management
Combine shot, stroke, and cycle counts. Link usage with event history.
01Combine shot, stroke, and cycle counts
02Link usage with event history
03Analyze quality deviations and signs of wear
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
Shot count, stand times and wear
Using existing systems
Link usage with event history
Analyze quality deviations and signs of wear
Comparing tools and components in context
Display inspection requirements and maintenance information
The process in detail
Combine shot, stroke, and cycle counts
Combine information with the appropriate process and source reference.
Link usage with event history
To make connections and open questions visible for professional evaluation.
Analyze quality deviations and signs of wear
Provide results, assumptions and required evidence in a comprehensible manner.
Comparing tools and components in context
Coordinate next steps with those responsible and obtaining the necessary approvals.
Display inspection requirements and maintenance information
Combine information with the appropriate process and source reference.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01Combine shot, stroke, and cycle counts
02Link usage with event history
03Analyze quality deviations and signs of wear
04Comparing tools and components in context
05Display inspection requirements and maintenance information
Schematic sequence according to the respective concept documents.
Compare fundamentals and impacts
Fundamentals & Assumptions
Combine shot, stroke, and cycle counts
Link usage with event history
Analyze quality deviations and signs of wear
Assessment & next steps
Comparing tools and components in context
Display inspection requirements and maintenance information
Schematic example view. Content and responsibilities will be defined in the specific process.
Connecting tool, process and application
ToolID, Version, Status, History
processMachine, parameters, material
ResultQuality, service life, cost
Next stepTechnical review and approval
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
Topic 11
Tool availability and production planning
AIDA · Tool Management
Link production plan and tool allocation. Check status, location, and machine availability.
01Linking production plan and tool allocation
02Check status, location and machine availability
03Coordinate maintenance and repair appointments
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
Tool availability and production planning
Using existing systems
Check status, location and machine availability
Coordinate maintenance and repair appointments
Identify conflicts with delivery dates early
Prepare coordinated courses of action
The process in detail
Linking production plan and tool allocation
Combine information with the appropriate process and source reference.
Check status, location and machine availability
To make connections and open questions visible for professional evaluation.
Coordinate maintenance and repair appointments
Provide results, assumptions and required evidence in a comprehensible manner.
Identify conflicts with delivery dates early
Coordinate next steps with those responsible and obtaining the necessary approvals.
Prepare coordinated courses of action
Combine information with the appropriate process and source reference.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01Linking production plan and tool allocation
02Check status, location and machine availability
03Coordinate maintenance and repair appointments
04Identify conflicts with delivery dates early
05Prepare coordinated courses of action
Schematic sequence according to the respective concept documents.
Steps and handovers over time
Step 1:Combine production plan and tool allocation.Preparation / Review
Step 2:Check status, location and machine availability.Preparation / Inspection
Step 3:Coordinate maintenance and repair appointments.Preparation / Inspection
Step 4:Identify conflicts with delivery dates early.Preparation / Review
Step 5:Prepare agreed-upon courses of action.Result / Handover
Schematic example view. Content and responsibilities will be defined in the specific process.
Connecting tool, process and application
ToolID, Version, Status, History
processMachine, parameters, material
ResultQuality, service life, cost
Next stepTechnical review and approval
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
Topic 12
Networking and proactively controlling systems
AIDA · Tool Management
Connecting ERP, MES, tool management, CAQ and PLM. Interpreting maintenance and production data in context.
CAD, drawings & materials
ERP & Tool Master Data
AIDA
Data · Knowledge · Tested Decisions
Using existing systems
Provide role-related assistance
Submit operational recommendations for review
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
Networking and proactively controlling systems
Using existing systems
Interpreting maintenance and production data in context
Identifying cross-system patterns and relationships
Provide role-related assistance
Submit operational recommendations for review
The process in detail
ERP, MES, tool management, CAQ and PLM combined
Combine information with the appropriate process and source reference.
Interpreting maintenance and production data in context
To make connections and open questions visible for professional evaluation.
Identifying cross-system patterns and relationships
Provide results, assumptions and required evidence in a comprehensible manner.
Provide role-related assistance
Coordinate next steps with those responsible and obtaining the necessary approvals.
Submit operational recommendations for review
Combine information with the appropriate process and source reference.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01ERP, MES, tool management, CAQ and PLM combined
02Interpreting maintenance and production data in context
03Identifying cross-system patterns and relationships
04Provide role-related assistance
05Submit operational recommendations for review
Schematic sequence according to the respective concept documents.
Connecting existing systems and responsibilities
Networking and proactively controlling systemsInformation in connection
Tool & ComponentAssign information
Machine & MaterialMaking dependencies visible
Parameters & RecipeDocument assumptions
Deployment, number of shots & operating timeClarify any open issues
Maintenance, repair & conditionCheck results
Quality, Costs & Production PlanTrack approvals
Schematic example view. Content and responsibilities will be defined in the specific process.
Connecting tool, process and application
ToolID, Version, Status, History
processMachine, parameters, material
ResultQuality, service life, cost
Next stepTechnical review and approval
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
Topic 13
Digital Twin tool
AIDA · Tool Management
Link product, machine, process, and tool. Combine condition, history, and quality data.
01Linking product, machine, process and tool
02Combining condition, history, and quality data
03Include drawings and versions
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
Digital Twin tool
Using existing systems
Combining condition, history, and quality data
Include drawings and versions
Cost and lifecycle perspective complement each other
Provide a unified picture from existing systems
The process in detail
Linking product, machine, process and tool
Combine information with the appropriate process and source reference.
Combining condition, history, and quality data
To make connections and open questions visible for professional evaluation.
Include drawings and versions
Provide results, assumptions and required evidence in a comprehensible manner.
Cost and lifecycle perspective complement each other
Coordinate next steps with those responsible and obtaining the necessary approvals.
Provide a unified picture from existing systems
Combine information with the appropriate process and source reference.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01Linking product, machine, process and tool
02Combining condition, history, and quality data
03Include drawings and versions
04Cost and lifecycle perspective complement each other
05Provide a unified picture from existing systems
Schematic sequence according to the respective concept documents.
Technical relationships and dependencies
Digital Twin toolInformation in connection
Tool & ComponentAssign information
Machine & MaterialMaking dependencies visible
Parameters & RecipeDocument assumptions
Deployment, number of shots & operating timeClarify any open issues
Maintenance, repair & conditionCheck results
Quality, Costs & Production PlanTrack approvals
Schematic example view. Content and responsibilities will be defined in the specific process.
Connecting tool, process and application
ToolID, Version, Status, History
processMachine, parameters, material
ResultQuality, service life, cost
Next stepTechnical review and approval
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
Topic 14
Process parameters and recipe history
AIDA · Tool Management
Assign historical production runs to comparable systems. Take tool condition and material batch into account.
01Assign historical production runs to comparable categories
02Consider tool condition and material batch
03Compare parameters, recipes and quality values
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
Process parameters and recipe history
Using existing systems
Consider tool condition and material batch
Compare parameters, recipes and quality values
Identify the best known setting under similar conditions
Provide a recommendation with sources and approval basis
The process in detail
Assign historical production runs to comparable categories
Combine information with the appropriate process and source reference.
Consider tool condition and material batch
To make connections and open questions visible for professional evaluation.
Compare parameters, recipes and quality values
Provide results, assumptions and required evidence in a comprehensible manner.
Identify the best known setting under similar conditions
Coordinate next steps with those responsible and obtaining the necessary approvals.
Provide a recommendation with sources and approval basis
Combine information with the appropriate process and source reference.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01Assign historical production runs to comparable categories
02Consider tool condition and material batch
03Compare parameters, recipes and quality values
04Identify the best known setting under similar conditions
05Provide a recommendation with sources and approval basis
Schematic sequence according to the respective concept documents.
Compare fundamentals and impacts
Fundamentals & Assumptions
Assign historical production runs to comparable categories
Consider tool condition and material batch
Compare parameters, recipes and quality values
Assessment & next steps
Identify the best known setting under similar conditions
Provide a recommendation with sources and approval basis
Schematic example view. Content and responsibilities will be defined in the specific process.
Connecting tool, process and application
ToolID, Version, Status, History
processMachine, parameters, material
ResultQuality, service life, cost
Next stepTechnical review and approval
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
Topic 15
Predictive Tool Maintenance
AIDA · Tool Management
Combine shot counts, process and quality data. Consider alarms and repair history.
01Combining shot counts, process and quality data
02Consider alarms and repair history
03Identify risk patterns for each tool and component
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
Predictive Tool Maintenance
Using existing systems
Consider alarms and repair history
Identify risk patterns for each tool and component
Align production planning and spare parts availability
Submit economically viable maintenance options for review
The process in detail
Combining shot counts, process and quality data
Combine information with the appropriate process and source reference.
Consider alarms and repair history
To make connections and open questions visible for professional evaluation.
Identify risk patterns for each tool and component
Provide results, assumptions and required evidence in a comprehensible manner.
Align production planning and spare parts availability
Coordinate next steps with those responsible and obtaining the necessary approvals.
Submit economically viable maintenance options for review
Combine information with the appropriate process and source reference.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01Combining shot counts, process and quality data
02Consider alarms and repair history
03Identify risk patterns for each tool and component
04Align production planning and spare parts availability
05Submit economically viable maintenance options for review
Schematic sequence according to the respective concept documents.
Assess risks transparently
Clarify entryProfessional assessment
Assess the impactProfessional assessment
Securing evidenceProfessional assessment
Coordinate the measureProfessional assessment
Combining shot counts, process and quality data
Submit economically viable maintenance options for review
Schematic example view. Content and responsibilities will be defined in the specific process.
Connecting tool, process and application
ToolID, Version, Status, History
processMachine, parameters, material
ResultQuality, service life, cost
Next stepTechnical review and approval
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
Topic 16
Integrated tool and production planning
AIDA · Tool Management
Consider production requirements and tool condition together. Include maintenance forecasts and spare tools.
01Consider production requirements and tool condition together
02Include maintenance forecasts and spare tools
03Making conflicts visible during the planning period
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
Integrated tool and production planning
Using existing systems
Include maintenance forecasts and spare tools
Making conflicts visible during the planning period
Compare sequence, maintenance, and location alternatives
Track approved measures and their impact
The process in detail
Consider production requirements and tool condition together
Combine information with the appropriate process and source reference.
Include maintenance forecasts and spare tools
To make connections and open questions visible for professional evaluation.
Making conflicts visible during the planning period
Provide results, assumptions and required evidence in a comprehensible manner.
Compare sequence, maintenance, and location alternatives
Coordinate next steps with those responsible and obtaining the necessary approvals.
Track approved measures and their impact
Combine information with the appropriate process and source reference.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01Consider production requirements and tool condition together
02Include maintenance forecasts and spare tools
03Making conflicts visible during the planning period
04Compare sequence, maintenance, and location alternatives
05Track approved measures and their impact
Schematic sequence according to the respective concept documents.
Steps and handovers over time
Step 1:Consider production requirements and tool condition together.Preparation / Inspection
Step 2:Include maintenance forecasts and spare tools.Preparation / Review
Step 3:Making conflicts visible during the planning period.Preparation / Review
Step 4:Compare sequence, maintenance, and location alternatives.Preparation / Review
Step 5: Track approved actions and impacts.Result / Handover
Schematic example view. Content and responsibilities will be defined in the specific process.
Connecting tool, process and application
ToolID, Version, Status, History
processMachine, parameters, material
ResultQuality, service life, cost
Next stepTechnical review and approval
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
Topic 17
Quality & Tool Performance Intelligence
AIDA · Tool Management
Link tool condition, process, and component quality. Compare scrap and rework using relevant parameters.
01Linking tool condition, process and component quality
02Compare rejects and rework using parameters
03Consider material batches, alarms, and changes
CAD, drawings & materialsReleased Foundations
ERP & Tool Master DataReleased Foundations
MES, Machines & Process ParametersReleased Foundations
CAQ, test values & quality dataReleased Foundations
Maintenance, repair & service historyReleased Foundations
Engineering knowledge & field experienceReleased Foundations
Connecting information and preparing results
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
CAQ, test values & quality data
AIDA
Quality & Tool Performance Intelligence
Using existing systems
Compare rejects and rework using parameters
Consider material batches, alarms, and changes
Represent relationships as testable hypotheses
Document measures and their effects in a comprehensible manner
The process in detail
Linking tool condition, process and component quality
Combine information with the appropriate process and source reference.
Compare rejects and rework using parameters
To make connections and open questions visible for professional evaluation.
Consider material batches, alarms, and changes
Provide results, assumptions and required evidence in a comprehensible manner.
Represent relationships as testable hypotheses
Coordinate next steps with those responsible and obtaining the necessary approvals.
Document measures and their effects in a comprehensible manner
Combine information with the appropriate process and source reference.
Technical review and responsibility
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
Source reference
Which documents, data, and versions support this statement?
Open points
What information, evidence, or decisions are still missing?
Permissions
Who is allowed to use the data and who releases the result?
Tracking
How are feedback and next steps documented?
Work steps and handovers
01Linking tool condition, process and component quality
02Compare rejects and rework using parameters
03Consider material batches, alarms, and changes
04Represent relationships as testable hypotheses
05Document measures and their effects in a comprehensible manner
Schematic sequence according to the respective concept documents.
Systematically examine hypotheses about causes
PersonTest hypothesis with evidence
machineTest hypothesis with evidence
materialTest hypothesis with evidence
methodTest hypothesis with evidence
Understanding deviationConfirm cause · Examine measure · Demonstrate effect
Schematic example view. Content and responsibilities will be defined in the specific process.
Connecting tool, process and application
ToolID, Version, Status, History
processMachine, parameters, material
ResultQuality, service life, cost
Next stepTechnical review and approval
Test fields and required documentation
Example of a technical testing and verification matrix
Test field
Test question
Next step
Tool & Component
Is the information regarding "Tool & Component" complete and supported by appropriate sources?
Assign source
Machine & Material
Is the information regarding "machine & material" complete and supported by appropriate sources?
Technical review
Parameters & Recipe
Are the details regarding "Parameters & Recipe" complete and supported by appropriate sources?
Clarify any questions
Deployment, number of shots & operating time
Are the details regarding "deployment, number of shots & operating time" complete and supported by appropriate sources?
Document release
Maintenance, repair & condition
Is the information regarding "maintenance, repair & condition" complete and supported by appropriate sources?
Assign source
Quality, Costs & Production Plan
Are the details regarding "quality, costs & production plan" complete and supported by appropriate sources?
Technical review
AIDATool management · Application concept
pilot
Your entry point: Tool management
A self-contained pilot with your specialists.
The task, sources, and technical evaluation criteria will be defined jointly. Reliable results will be derived from representative cases and your team's assessment.
01Task
02Data & Rights
03Technical examination
04Pilot evaluation
Application in everyday work
Illustrative representation of the application area.
Design, parameter changes, maintenance measures and production decisions are professionally evaluated and approved before implementation.
jointly define the scope of the pilot project
Select a recurring task and person responsible
Combine information with the appropriate process and source reference.
Coordinate representative data and access rights
To make connections and open questions visible for professional evaluation.
Define result quality and necessary evidence
Provide results, assumptions and required evidence in a comprehensible manner.
Evaluate the pilot together and decide on next steps
Coordinate next steps with those responsible and obtaining the necessary approvals.
From example to professionally reviewed application
01Select a recurring task and person responsible
02Coordinate representative data and access rights
03Define result quality and necessary evidence
04Evaluate the pilot together and decide on next steps
Jointly review data, results, and responsibility
CAD, drawings & materials
ERP & Tool Master Data
MES, Machines & Process Parameters
AIDA
Pilot with agreed data and test criteria
Using existing systems
Verifiable proposal
Technical feedback
Next step
Measurement points for the pilot
Jointly agreed pilot assessment
Measuring point
Test question
Processing effort
How much time does the team need for technically usable preparation?
completeness
Have relevant sources, limitations, and evidence been taken into account?
Quality
What corrections and questions remain before use?
Traceability
Are the fundamentals, responsible parties, and approvals identifiable?
Total expenditure
What costs are involved in data, integration, and operation?
1 / 19
Illustrative application concept. Numbers, comparisons, and processes are examples and will be tested against your data and systems.
Is the tool available, ready for use, and suitable for the job?
Tool history, last settings, repairs, usage and production requirements are documented to varying degrees.
This is where the AIDA application concept comes in: making tool knowledge usable, from digital resumes to predictive control. The first step is a limited pilot project with your experts and approved data.
This is how the process can look
Transferring paper and Excel files into a structured tool file
Linking tool, production, quality and maintenance data
Consider availability and maintenance requirements together
Examine engineering and service applications as a further development stage
Which sources are connected and which actions are possible depends on the available interfaces, permissions, and the agreed project scope.
How to evaluate the pilot
Search effort; completeness of the tool history; unclear availability.
We compare agreed-upon tasks before and during the pilot project. Reliable results are obtained using representative data and the professional evaluation of your team.
Clear responsibility in the process
Implementation and expansion depend on the available data. Forecasts and tool design require suitable data and expert validation.